Now suppliers themselves determine the level of stocks to be acquired to cover their customers' needs for the year. The 2017 Law on Hydrocarbons eliminated the government-imposed storage obligations for suppliers. Third-party access to gas storage capacities is ensured by legislation (Energy code). Teréga, one of two country’s TSOs, operates two oldest gas storage sites in aquifers in the south-west part of the country (in Izaute and Lussagnet, built in 1957), representing a total volume of 2.9 bcm (24% of total capacity).Storengy also operates salt caverns in Manosque owned by Géométhane. Storengy, a 100% subsidiary of Engie created in 2009, operates 13 sites in France (plus six in Germany and one in the United Kingdom), including ten in aquifers and three in salt caverns, with a total volume of 9.3 bcm (76% of country’s capacity).There are two underground gas storage operators: The total gas storage capacity in France amounts to 12.2 billion cubic metres (bcm) (29% of yearly consumption). Storage facilities are used to manage pipeline flows and seasonal demand swings, as well as to capture price arbitrage opportunities. There is no public or strategic natural gas storage in France and underground natural gas storage facilities are an essential tool for allowing operators to balance their systems and optimise their gas use. Natural gas infrastructureįrance has a number of commercial natural gas storage facilities located across the country. ![]() Following a Ministerial order of 18th February 2010, the Dunkerque LNG terminal is exempted from regulated third-party access and tariff regulation for all regasification capacities of the terminal for a period of twenty years from the date of commissioning. Three out of four LNG terminals are functioning on the basis of full third-party access. The Dunkerque and Montoir terminals have no plans to expand over the next decade, while the terminals in Fos sur Mer are studying an expansion. The average utilisation rate of the French LNG terminals was 41% in 2019. The Dunkerque terminal is majority owned by Belgium’s Fluxys with a minority held by Korean investors. The Fos Cavaou terminal is owned by Fosmax LNG, a subsidiary of Elengy and Total (shares of 72.5% and 27.5% respectively), and is operated by Elengy. Terminals in Fos Tonkin and Montoir are owned by Elengy (a 100% subsidiary of Engie). Both transmission and distribution networks are open to third-party users.įrance has four LNG terminals (two in Fos sur Mer on the Mediterranean, one in Montoir de Bretagne on the Atlantic and one in Dunkerque on the North Sea). The French gas distribution network totals 195 000 km, the second-longest gas network in Europe after Germany. GRDF operates 95% of France’s distribution grids, while 22 local distribution companies cover the remaining 5% and offer their own regulated tariffs. The two networks interconnect in Castillon-la-Bataille (Department of Dordogne) and Cruzy (Hérault).ĭistribution networks are owned by local communities and are managed through a concession-based system whereby concession agreements govern the relationship between local authorities and Gaz Réseau Distribution France (GRDF), a subsidiary of the Engie. Teréga, TotalEnergies's former subsidiary, operates the remaining 13% of the system, with 650 km of the main network and 4 450 km of the regional networks in the south-west of France. GRTgaz is controlled by Engie, which in July 2021 sold its 11.5% share in the company to financial institutions Caisse des Dépôts and CNP Assurances, and together now control 39% of GRTgaz, while Engie retained 61%. ![]() GRTgaz operates 8 110 km of the main network and 24 043 km of the regional networks (together around 87% of the total gas transmission network in France). The natural gas transmission network is operated by two TSOs: GRTgaz and Teréga. Neither project was included in the latest list of projects of common interest of the European Commission. The latest sunrise is on 2 January or 3 January.In the past, France considered building new gas pipelines within France and between France and Spain (MidCat and South Transist East Pyrenees projects), but abandoned these plans in the face of expected reductions of gas consumption in France and overcapacity of the grid. The Earth was closest to the Sun at this time. Perihelion was on 3 January 2024, 01:38 in Dordogne. Dates are based on the Gregorian calendar.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |